Webinar Details
Are you faced with the following challenges while planning your tugger trains?
- Conventionally timed tugger trains work but they are not efficient.
- Tugger trains first need to be implemented - preferably right the first time
- Tugger trains without real-time support are rigid and inflexible
- There’s no transparency concerning the actual utilization of tugger trains
We understand these challenges. However, using the right tools can make your planning easier!
Do you already have specific questions about the software ipolog and would like to discuss your unique use case? We look forward to speaking with you during a complimentary ipolog web demo!
Webinar Recording
Webinar Slides
Slides
You can view the slides from the webinar here >>Download Slides
Our Presenter
Tobias Heubeck - Flexus AG
Tobias Heubeck ist Head of Sales at Flexus AG. With his know-how and clever solutions, he strives to sustainably improve companies' intralogistics.
Tobias Herwig - ipolog GmbH:
Tobias Herwig is an expert for digitalization of assembly and logistics. He hosts the podcast "Factory of the Future" on LinkedIn.
You may also be interested in:

Flexible Cell Production
Assembly reimagined! Focusing on the optimal utilization of employees can lead to enormous efficiency gains and cycle time sequence losses can be reduced to a minimum.

Assembly Planning
Find out how you can master the challenge of optimizing very different work tasks from cycle to cycle in order to achieve a higher workload capacity.

Logistics Planning
Ensure that the right parts are available at the right place, at the right time and in the right quantity with the optimal resource requirements.
Your Contact

Elin Trebing
Phone: +49.7152.70010.53
Cell: +49.151.19398306
Email: elin.trebing@ipolog.ai