Human Resource Planning

Effective Workforce Management Through Software

Determine your personnel planning – optimal resource planning with ipolog

Manufacturing several products with different equipment requirements on one assembly line requires a lot of work preparation and the right tools for personnel scheduling. If this is done incorrectly there will be long waiting times in which no added value is created.

Simulate workflows in your production with ipolog and sustainably harness the productivity of your colleagues. Find out here how this is possible.


Good human resource planning is simply a must!

Our mission is to ensure efficiency and sustainability in strategic and tactical planning for assembly and daily operations.

We offer a powerful software that optimizes the assembly process from the initial planning stages to operative use in daily workforce planning. Benefit from holistic planning and the advantages that come from the ideal utilization of employees in assembly and adjacent areas.

Why is personnel planning so important for your company?

You have great employees with unique and special skills. The challenge lies in correctly scheduling them over the year and utilizing their abilities most effectively. As a shift planner you must also be able to react quickly to unplanned situations, such as sick leave or other emergencies. A system is needed that automatically maps and adjusts the optimal utilization of resources and capacities in a system, while still considering illnesses and differing abilities.


Personnel planning deals with the optimal deployment of available assembly employees based on current conditions and competence requirements. The focus here is on achieving the goals required by production with a minimum use of resources.


Do you also face the following challenges in your personnel planning?


  • Changes in personnel planning

    You are confronted each morning with changes in employee attendance – illnesses, family emergencies or the unplanned traffic jam. There are many reasons for spontaneous change, but this is no longer a headache for you. ipolog can automatically assign the required and available employees to the scheduled jobs based on a stored competence matrix. 

  • Changes in the production program

    Your customer makes a change to the order quantity or there are mixed model variations. In the past this would have been a major issue. ipolog allows you to relax and stay in control of the situation. The ipolog software calculates the required number of assembly workers based on the current production program and shows the effects if there is not enough planned capacity.

  • Unreliable work planning

    It all happens at once: Your employees have to be distributed differently, the existing capacities of the respective shift have to be planned sensibly, and you have to keep an eye on the production program. ipolog ensures efficient and reliable work scheduling, so that you can see in advance what the changes in the production program will bring to you and your team.

Recognize the advantages of personnel planning with the help of software

Software-supported personnel planning provides enormous relief in the daily planning of staff deployment and completion of the workload. In our ipolog software individual work processes are displayed on monitors.

By using a software for employee capacity planning, gain transparency in planning and in the execution of tasks. Always have an overview and be able to react well to spontaneous changes. ipolog provides coherence between planning and business operations as well as a transparent display of employee workload and tasks.

Image

This is why your human resource planning should be done in our ipolog tool!

Human resource planning in ipolog allows you to combine several advantages to achieve major improvements in the productivity of your assembly. Comprehensive planning in ipolog helps you to see where you can save resources and our 3D simulation allows you to test various scenarios in order to achieve enormous time savings in work preparation.

The automatic assignment of tasks to your employees gives you time for more important things. There’s no longer a need to manually think about the daily scheduling of employees in an Excel spreadsheet. Our software suggests when an employee at any given workstation should take over a certain task.

This also has the advantage that employees are ideally utilized. Being overworked or underchallenges is a thing of the past. Flexible rescheduling and automated planning in an integrated system makes daily work easier.

  • Reschedule employees at the push of a button

    With our software ipolog, changes in personnel availability are no longer a headache. ipolog can automatically assign the required and available employees to the scheduled jobs based on the stored competence matrix.

  • Automatically adapt employee planning to changed production program

    With ipolog, you remain in control of the situation even if the model mix fluctuates or the number of pieces is adjusted. The ipolog software always calculates the required number of assembly workers based on the actual production program or shows the effects if there is insufficient planned capacity.

  • Efficient work preparation

    The ipolog software ensures efficient and reliable work preparation, so that you, as the person responsible for assembly and logistics, can see in advance what is in store for you and your teams as a result of changes in the production program.

How to achieve optimal workforce planning without Excel

Workforce planning is a part of ipolog’s continued vision in the field of operative planning and control. The following steps lead the way to perfect workforce planning:

  • 1. Structure of a digital twin

    The starting point is found in the digital twin that is created in assembly planning with ipolog. The model includes optimally timed assembly processes and detailed station assignments. An order sequence from the production program planning considers a wide variety of product variants. This makes the exact product sequence and detailed assembly instructions clear.

  • 2. Import of personnel information

    Further planning input with employee information is easily imported from Excel. This includes employee availability and competence matrix (who can work at which stations). The listing of priorities is done in ipolog.

  • 3. Planning Preview

    A preview of production for the following shift, tomorrow, next week, or next month- whatever you need. Ipolog shows the requirements and provides planning reliability for order-related, efficient employee scheduling.

Our ipolog software also offers the possibility to move related work modules within a cycle or to occupy one or more workstations per cycle.

Would you like to start optimizing your human resource planning right away? Then get started with us! We would love to discuss your unique requirements in a one on one conversation.

This may also be of interest

Production Planning with Software ipolog

Production Planning

Find out how you can create the ideal conditions to produce your product portfolio with quantities and variants as efficiently as possible.

See Production Planning
Ressourcenplanung mit der Software ipolog

Resource Planning

Optimize the resources required for a given production program to keep production running with low investment and operational costs.

See Resource Planning
Assembly Planning with Software ipolog

Assembly Planning

Find out how you can master the challenge of optimizing very different work tasks from cycle to cycle in order to achieve a higher workload capacity. 

See Assembly Planning
 

Your Contact

ipolog Kontakt - Martin Rometsch

Martin Rometsch

Phone: +49.7152.70010.21
Cell: +49.1511.2294159
Email: martin.rometsch@ipolog.ai

Newsletter Registration

Free Webinars - Hot News - Great Events

For more information see our privacy policy.