Assembly & Logistics Planning
ipolog Glossary
A
Aisle WidthAssembly Line
Automated Guided Vehicle (AGV)
Automated Small Parts Storage
Automated Transport System
B
Bill of MaterialBlock Stacking
C
CarsetCompletion Time
Container
Container Change
Cycle time
D
DestinationDirect Transport
Dynamic Heat Map
Dynamic Tugger Train Evaluation
E
EmployeeEmployee Productivity
Empty Containers
F
Final AssemblyFloor Block Storage
Floor Row Storage
Forklift
Full Container
H
High Bay WarehouseI
Installation RateInventory Range
J
Just in Sequence (JIS)Just in Time (JIT)
L
Large Standard StillageLatest Possible Staging Time
Layout Area
Layout Structure
Line
Linking Factor
Loading
Loading Equipment
Logistic Family
Logistical Quantity Structure
M
Master DataMaterial Area
Material Staging
Matrix
Maximum Speed
Maximum Stock Level
Methods-Time Measurement (MTM)
O
Operating ExpensesOrder List
P
Pearl Chain ConceptPlanning Status
Pre-assembly
Process Block
Procurement Costs
Production Chain
Production process – cyclical
Production process – linear
Production Volume
Purchase Part
Purchase Requisition
Q
Quadrant TypeR
RampReorder point (ROP)
Replacement Quantity
Resource
Resource Management
Resource Type
Route
Route Network
S
Safety StockScenario
Shelf
Shelf Space
Shelf Type
Shift Schedule
Small standard stillage
Source
Spatial Geometry
Special Load Vehicle
Stacking Factor
Staging Location
Standard Supply Chain
Starting Inventory
Stop
Storage Capacity
Storage Unit
Supply Chain
Supply Unit
T
Time Module AdministrationTime-Related Tugger Train Load
Timetable
Total Net Hours
Tour
Tour Start Distance
Towing Truck
Trailer Capacity
Trailers
Transport Order
Trolley
Tugger
Tugger Train System
Tugger Train System Planning
Tugger Train Workload Utilization
U
Unit LoadUnit Load Capacity
Unloading
W
WaypointWork Process